Situated along Highway 14, the Lieser Road Bridge Emergency Repair project involved the demolition and replacement of a 102 foot prestressed bridge girder. After the new girder was placed, 35 yards of concrete was formed and poured, connecting the new girder to the existing bridge. A new 112 foot long traffic barrier was also constructed, and new asphalt was applied to the roadway. As the general contractor, Tapani worked with WSDOT to keep the public informed and ensure safety throughout the project.
Vancouver, WA
WSDOT
Demolition, Bridges, Road Construction
WA #TAPANI*8830E, OR CCB#63434, ID #RCE – 58709