The Valley View Estates Project consisted of the civil site development for a 9.26 acre, 36 single family building lot subdivision in the Northwest part of Camas, WA. With multiple natural springs on the hillside discharging water year-round, proper groundwater control and filtration was essential to ensuring this project’s success. This operation included building two water detention ponds with overflows leading into multiple Baker tanks and a Contech Filter Vault that then discharged the clean water back into the public storm system. Our crews also performed the grading of approximately 8 acres of the site including the movement of 60,000 cubic-yards of material, and we installed over 8,500 linear feet of storm, sewer, and water utilities ranging from 8” – 18” in diameter. Our scope also included building over 13,000 square-feet of Allen block retaining walls to provide stabilized areas for future home foundations, building pads, a public trail, over 3,300 square-feet of sidewalks, and the extension of NW Goodwin Street through the entire subdivision, which opened up access to the Columbia Palisades area of Camas.
Camas, WA
Firestone Pacific Development Inc
Excavation, Retaining Wall, Subdivisions, Road Construction, Utilities, Grading
WA #TAPANI*8830E, OR CCB#63434, ID #RCE – 58709