Tapani performed the sitework for two concrete tilt-up buildings totaling 340K SF, as well as 412K SF of parking lot and loading dock. The project also involved the installation of essential utilities, including stormwater, sanitary, and sewer systems, along with two stormwater ponds.
Vancouver, WA
Panattoni
Buildings, Commercial, Concrete Tilt-Up, Commercial Sitework, Utilities
WA #TAPANI*8830E, OR CCB#63434, ID #RCE – 58709