Recent Project:

Tapani Equipment and Fabrication Shop

Tapani crews design-built a 22-thousand-square-foot concrete tilt-up building with 30-foot-high walls at their company’s headquarters in Battle Ground, Wash. The building included space for an equipment shop, fabrication shop, conference rooms and offices. The project consisted of concrete, wood and steel construction. The shop portion included three overhead cranes, two jib cranes and a state-of-the-art power wash bay. The metal fabrication shop included a large shear, large brake, computer numerical control (CNC) plasma table, and other state of the art equipment. The office portion included architectural finishes and contained a storefront entry, parts room, 12 office spaces, break room with a kitchen, and two conference rooms.

Scroll to Top